Archives
- 2022
- 2020
- 2018
- 2017
- 2016
- 2015
- 2014
- 2013
- 2012
- 2011
- 2010
- 2009
- 2008
-
2007
- December
-
November
-
Etonic Networks Hosting
11/14/07
Albert Einstein is always right.
-
Updates
11/12/07
Finally got the UPS' in on Friday and within the hour we got them installed and operational.
Also, the core router is now happily running on new hardware with lots of memory and fiber ports :D YAY!
No network outages at this moment.
Let's hope it stays that way -
New Hardware for Core Router
11/08/07
It's finally here. Friday night at 10:30PM we're going to swap the Core router and move it to better, faster, more reliable hardware.
Downtime should be +/-30 minutes. Hopefully everything will work out as scheduled.
Check back here for updates or changes... -
UPS Batteries Update
11/08/07
They are on their way. Theory says we should get them unloaded and installed early next week.
Hopefully if everything works out, the downtime should he minimal, more like 10 minutes tops. We'll schedule it for Tuesday or Wednesday but check this post for detailed updates. -
Server move done!
11/08/07
Finally the server move is complete. All users should notice increased speed in page load, and better overall performance.
Ererything else is running smoothly at this time. -
Data Vvvvault Down :(
11/05/07
Friday, Nov 2nd we had some problems with one of our Data Vault servers.
This machine decided to reject all incoming connections at about 3:00pm EST.
The main web server, being as smart as it is locked it out displaying a message that you should try out later when you tr -
Upcoming Server Move
11/05/07
Web server mojito and tequilla are being moved to new hardware. Most likely tonight. If you're housed on one of these machine, be aware of this scheduled downtime.
As always, your e-mail services, webmail, database, etc should not be affected by this downtime.
Estima
-
Etonic Networks Hosting
- October